Structural Steel / Bridges / Pedestrian Bridge in Gold Coast, Australia

More Case Studies

 

Project Name:

Pedestrian Bridge in Gold Coast, Australia

Client Type:

Structural Steel Fabricator

Software Used:

Tekla

PGT Scope:

Structural Steel detailing for Main & Misc. Steel

Tonnage:

Around 200 MT

Project Deliverables:

  3D Model in Tekla

  Erection & Shop Drawings

  BOM

  KISS / NC Files

Solution provided by PGT:

Pre- Cambering was introduced after all the detailing work was done. The delivery schedule was not considerate of these changes and PGT was needed to deliver on this challenging schedule, which was achieved.

Benefits / Challenges:

PGT's experience in suggesting proper connections, wherever structural information was missing. This helped in expediting the project.

Get Quote

Testimonial

Previous Next