Case Studies

Decolorization Skid
Detailed Engineering Services for Pre-filter & Post filter skid (4 Skids). Refinery Discharge was Decolorized before releasing to Treatment Process. These skids were to be transported via 2 ways – Roads and Sea..More

Batching Plant
This is Powder Mixing Plant. Three storied steel structure is designed, analyzed with fabrication drawings preparation. This plant operational flow is vertical. Elevation for each floor was critical from Operations & Maintenance..More




Piping Engineering
Piping Engineering is
very crucial in any
Process Units as Piping
carries a considerable
cost in EPC. Pan Gulf
Technologies Piping Team
is well aware of the
industry specific
challenges and this
knowledge, their vast
experience can be seen
in the executed project.
Software used by our
Piping Team are like
AutoCAD Plant 3D, PDMS,
SP3D, CADworx, PDS,
CAESAR II, etc. Other
software can also be
used based on project
requirements.
Under Piping Engineering, we offer following services:
· Accurate 3D Modelling
· Preparation of design basis and sizing
· Plot Plan, Equipment Layout
· Optimized Piping G A & Layouts
· Accurate BOM Preparation
· Pipe Stress Calculations
· Pump House Design and Detailing
· Piping Isometric Drawings Preparation
· Fabrication / Spool Drawings Preparation
· Pipe Supports
· Fire Protection System Design & Detailing
Get Quote
Testimonial
Previous Next"The team works hard and is willing to put in extra effort to hid deadlines, even when they are given at short notice. They seem to have a great understanding of the job requirements and can therefore produce effective modeling, drawings, RFI, etc. It is a real pleasure to work with the Pangulf Team! "
Electrical Contractor and Building Technologies Integrator based out of the USA
"Working with Pan Gulf have been good so far, they are very responsible and very proactive. Obviously at this point of the Job, I am just able to provide feedback on detailing and fabrication stage. Once the erection process starts, I can have a better idea on how good and clear the drawings are for our erection crew"
Structural Steel Fabricator in the USA
"It will take time to get the quality of drawings to Excellent – part of the reason is that our Revit models have a very unique workflow and have to be modelled very specifically to support our AR/VR and Estimating/QTO requirements. "
BIM Consulting Firm based in the USA