Structural Steel / Education / High School Project

More Case Studies

 

Project Name:

High School Project

Client Type:

Structural Steel Fabricator

Software Used:

Tekla

PGT Scope:

Model Creation in Tekla, Structural Steel detailing for Main & Misc. Steel

Tonnage:

496 Tons

Project Deliverables:

  3D PDF, IFC & BIM SIGHT

  Erection & Shop Drawings

  ABM

  KISS / NC / DXF Files

Solution provided by PGT:

This project required coordination with other trades viz. joist, deck, MEP. PGT actively participated in coordination with other trades for timely delivery and completed project on time.

Benefits / Challenges:

This job had several school buildings interconnected to each other. Some buildings connected to existing buildings that required coordination with field to get existing dimensions. PGT coordinated for all such requirements to make sure there were no issues related to field dimensions/coordination. Also, there were new rails added in existing stairs that required additional coordination with field.

Client feedback:

Project erection successfully done without any major field fit-up issues irrespective of coordinating with existing buildings.