Structural Steel / Industrial / Modernization of Port

More Case Studies

 

Project Name:

Modernization of Port

Client Type:

Structural Steel Fabricator

Software Used:

Tekla

PGT Scope:

Model Creation in Tekla, Structural Steel detailing for Main & Misc. Steel

Tonnage:

244 Tons

Project Deliverables:

  Tekla Model, IFC

  Erection & Shop Drawings

  ABM

  KISS / NC / DXF Files / Imports from EPM plugin

Solution provided by PGT:

This project requires coordination with other trades viz. gratings & piping coordination. PGT actively participated in coordination with other trades for timely delivery and completed project on time. Stair tower complete design including tower structure was in PGT scope. PGT coordinated with Connection Designer to get the structure designed and then detailed the same.
There was no separate BIM coordinator from General COntractor and it was difficult for fabricator to coordinate with piping division to resolve the conflict. PGT offered help of in-house BIM department to get these coordinated and put forward clashing items for Client to resolve. MS-Team video conference with screen sharing was used to discuss those clashes and get resolution.. 

Benefits / Challenges:

This project is port structure, with heavy special paints & weather bolts. It is connected to existing slab & piles. Anchor bolts were already cast that required coordination with field to get existing dimensions. PGT coordinated for all such requirements to make sure there were no issues related to field dimensions / coordination.
 