A highly critical water infrastructure project to deliver Weir, Intake structure, Powerhouse, walkways, Retaining wall.
This project presented unique challenges, including handling the entire structural scope and navigating unclear input data.
Reinforcement detailing for all in-situ elements of all blocks.
Delivered Capping Beam, Core walls, RC Walls, Slab & Beam for a power station building will accommodate 260 apartments.
We delivered 300 Drawings of Capping Beam, Core walls, RC Walls, Slab & Beam.
We delivered 2D drawings, BBS, 3D Model in Tekla. we identified critical elements such as segments, deviators, blisters, and piers, detailing them in 3D using Tekla to resolve clashes effectively.
Reinforcement detailing & bar bending
schedule of all RC member.
The Development of 140-bedroom hotel and residential with Basement plus 2 towers of 5 upper floor & 8 upper floors.
Redevelopment of a 3 storey Landmark office building into 8 storey mixed-use complex comprising 116 new apartments including retail and commercial units, and a new exhibition center.
Redevelopment of an old commercial center site to create a leading Tech company’s European HQ Campus. The development includes the demolition of 4 office blocks and the development of 6 storey office buildings over three levels of the basement.
This project was for construction of an additional floor over the existing single storey (12.5 metres high), flat roofed tennis hall, presently comprising indoor courts 1 and 2, to provide two additional indoor tennis courts (totalling 1,240 square metres gross floor space) at second floor level.