This is 5-ton staircase requiring 150 manhours.
We modelled & detailed the curve stairs at the lobby in the Moye White project in SDS/2 Department.
The project was expected to show many changes post-award and it was lacking in key dimensional information at the start of the project
Model Creation in SDS/2, Structural Steel detailing
for Main & Misc. Steel
The Baker’s Place project in USA, Wisconsin is a new 14-story mass timber mixed-use development that will create 206 homes and preserve the oldest historic piece of the original Gardner Baking Co. Building. Our expertise and mixed blend of high-end automation tools helped us pass through easily.
Structural Steel detailingfor Main & Misc. Steel
Structural Steel detailingfor Main & Misc. Steel
Model Creation in SDS/2, Structural Steel detailing for Main & Misc. Steel
Model Creation in SDS/2, Structural Steel detailing for Main & Misc. Steel
Model Creation in SDS/2, Structural
Steel detailing for Main & Misc. Steel
Model Creation in SDS/2, Structural Steel detailing for Main & Misc. Steel
Model Creation in SDS/2, Structural Steel detailing for Main & Misc. Steel
A five-story industrial building in New York City, USA. A 166-foot-tall structure will span 840,000 square feet and house logistics and warehouse space featuring truck courts, a distribution center, two stories of film and television studios, office space, and on-site vertical parking.
The main stadium is a state-of-the-art structure which is a multilevel structure with 65,000 capacity, 20 suites, and 230 VIP seats
The project was also published in the "Modern Steel Construction Magazine in May 2022" under the title “STRUCTURALLY SOUND”, a remarkable achievement.
The bridge is 130 meters pedestrian bridge spanning across the river. Constructed for people to walk, scoot or cycle using the bridge to commute easily towards another side.
A "Fulfilment Centre Warehouse” project based in OH, USA. A very timebound and challenging project, yet PGT was successful in progressing at a rapid pace of 1,350 tons of steel detailed per week. Our expertise and mix blend of high end automation tools helped us pass through easily.
The project was for a new hospital complex based in Minot, North Dakota. A non-profit organization with more than 150 physicians and is the largest employer in Minot