Pan Gulf Technologies Engineering Services

BIM Case Study - School Project

Get to know more about the project below

SCOPE OF WORK:

Create 3D BIM Model at LOD 300 in accordance with the 2D plans provided. Coordination between Stability, ARCH, Rebar and MEP model.

AREA IN SQ.FT. (if available):

86,94,796 SFT APPROX.

SOFTWARE USE:

Revit 2019, Navisworks, BIMcollab

PROJECT DELIVERABLES:

3D Model in Revit 2019, Navisworks

PROJECT DESCRIPTION:

SVM Moorslede is School project, where a portion of an existing structure needs to be demolished and rebuild.

BENEFITS / CHALLENGES:

PGT has received all file in Dutch language, which was quite challenging to model from those data, so we determine out a few generally used words to understand the document as per the project.

SOLUTION PROVIDED BY PGT:
Conflict among the different trades (ARCH, Stability, Rebar detailing and MEP) was happening lot. So, We have use BIM Collab for collaboration with client as well as within the team too.

Get in touch with our

Expert’s Today!