Pan Gulf Technologies Engineering Services

Underground Motorway Scheme - Australia

Get to know more about the project below

Play Video

About The Project

It's a 33-kilometer (21 mi) predominately underground motorway scheme currently under construction in Sydney, Australia. The motorway scheme, a joint project of the New South Wales and Australian governments, encompasses.

Project Scope:

Precast Detailing in 3D(TEKLA) for Exhaust & Supply ventilation building, consisting of H Walls, Planks, Shell Beams, Columns. Total 550 Precast units Modelled in TEKLA & Shop drawings were generated for this Project.

Software:

- 3D(TEKLA)

Key Challenges & Solutions

  • Project was already delayed at client’s end & PGT was shortlisted based on capacity to undertake challenging time lines. The drawings were delivered 2 weeks before the ETD. Being a multi-storey ventilation system building for a motor way. The collaboration of precast and ventilation system which was supported by steel
  • structure was challenging. Constant updates in design drawings & communication expected on Acconex
  • Special BBS requirement & accordingly CSV Files were to be submitted as a part of PGT’s scope
  • PGT’s in house TEKLA technician programmed to prepare customised CSV Files

Get in touch with our

Expert’s Today!