Get to know more about the project below
PGT’s scope was SD stage modelling of a Hotel which had to include some certain available DD stage inputs and façade treatments along with documentation.
The project consisted of a Seven- Story Hotel building with 180 guestrooms, a lobby, breakfast area, fitness room, restaurant/bar, meeting space and separate retail space. The building had a concrete podium with wood frame structure above with an exterior cladding of stone, brick, stucco, glass, and a variety of metal cladding.
- 3D Model in Revit
- Schematic drawings
- Revit
61,556 Sq. ft.
Challenges:
During the discussion phase of this project, the client had strict deadlines and a shortage of resources. The obvious challenge (for PGT) was to understand the expectations/need of a new Customer/Project and deliver a quality
product within a tight schedule. The project was delivered on time and now the client trusts us as their extended
production team also allowing the client resources to do the more front-ending.
Solutions:
The project being at the Schematic stage had some amount of ongoing design changes/alterations. PGT was proactive
in identifying and communicating certain design and accessibility issues to the customer while executing the project.
Get in touch with our
Expert’s Today!