Tonnage:

- 2900 MT

Key Challenges::

- Critical geometry of the roof structure, with multiple   architectural features
- Combination of rolled / built up circular sections, hence   limitation on length of each part, considering the material   availability.
- Skew pipe to pipe welded connections, resulting into, huge   development work, for plates to be carried out.

Metro Project

Tonnage:

- 3400 MT

Key Challenges::

- Long span trusses with Pre Camber
- Multilevel Struts
- Precast Panel Decking, which had to be interfaced, with the    structural steel elements