Get to know more about the project below
This was one of the most prestigious and largest sea-bridge freeway projects executed by our team. We had to ensure that two things were delivered: accuracy and quality. Our team achieved both, while also meeting deadlines ahead of schedule.
Creation of 3D models and preparation of shop drawings, including clash checks.
IFC Model, shop drawings, and bar bending schedule for the following elements:
01. Segments Pier
02. Integral Heads
03. End Piers
04. Sections
05. Diaphragm
06. Ramps
- Tekla