Manufacturing Factory Project

Get to know more about the project below

About the Project

Pan Gulf Technologies Limited delivered a full-scale electrical BIM solution for a uniquely designed manufacturing facility in the USA. The high-intent design of the factory demanded precise modeling, coordination, and deliverables for electrical systems

Client Overview

The client required a collaborator who could navigate an unconventional structural design and deliver accurate models despite complexity. Pan Gulf Technologies Limited stepped in to drive communication-heavy coordination and precise modeling—building trust through delivery and quality.

Scope of Work

Modeled electrical feeders, branch circuits, power systems, lighting, and equipment. Coordinated across disciplines to ensure clash-free electrical systems. Delivered shop drawings and prefabrication (prefab) drawings for electrical components.

Key Challenges

The facility’s layout and design were uniquely non-standard, requiring careful adaptation to the model. Three months of back-and-forth coordination with Intel were needed to secure model approval. Midway through, the client requested a Bill of Materials (BOM) extract for cables—added scope that demanded precise and swift action.

Solutions Delivered

Pan Gulf Technologies Limited prioritized streamlined, data-oriented communication throughout the project, anchoring on the team motto: “communication is key.” By maintaining rigorous coordination with the client, the team navigated design complexities and delivered the requested BOM extract on time. This marathon-like phase was completed successfully, and the project is now prepared for its next phase

Software Used

Revit (Electrical BIM)
Navisworks (Clash Detection & Coordination)
BIM 360 (Collaboration Platform)
Bluebeam (Review and Markup)

Results Achieved

Achieved model approval via sustained client dialogue and coordination. Delivered accurate and comprehensive electrical BIM models, shop, and prefab drawings. Successfully integrated additional deliverables, like BOM cable data, without delays. Set a strong foundation for future phases, showcasing our adaptability and execution under prolonged delivery timelines.