Pan Gulf Technologies Engineering Services

Precast Case Study- IFLY

Get to know more about the project below

SCOPE OF WORK:

Preparation of 3D model in TEKLA and shop drawings for more than 36 units.

Software:

Tekla

JOB DETAILS:

Thirty-six complex units of a sloping structure were to be detailed in TEKLA.

KEY CHALLENGES:

Locating and arranging bracing was a challenge due to the sloping shape of the structure and the lack of intermediate horizontal support.

Get in touch with our

Expert’s Today!