Pan Gulf Technologies Engineering Services

Precast Case Study- IFLY

Get to know more about the project below

Play Video

SCOPE OF WORK:

Preparation of 3D Model in TEKLA & Shop drawings for more than 36 units

Software:

Tekla

JOB DETAILS:

36 Complex units of a sloping structure were to be detailed in TEKLA.

KEY CHALLENGES:

Locating and arranging bracing was a challenge. Due to sloping shape of structure and there wasn’t any intermediate horizontal support.

Get in touch with our

Expert’s Today!