Get to know more about the project below
It was under construction: a hotel and residential building located in Dublin, Ireland, expected to be completed by 2021. The development consists of a 140-bedroom hotel and residential units, with a basement and two towers: one with 5 upper floors and the other with 8 upper floors.
01. Preparation of RC Shop Drawings & BBS for:
02. Foundations
03. Basement to Upper Floor Slab
04. Transfer Beams
05. Columns
06. Core Walls
07. Staircase
08 Retaining Walls
09 Underground Water Tank
10. Pipe Trenches
11. Manholes & Ramp Slab
12. Ramp Walls & Electric Substation
- AutoCAD with CADS-RC
Get in touch with our
Expert’s Today!
We use cookies to improve your browsing experience, provide essential site functions, analyze traffic, and deliver personalized content. By clicking Continue, you agree to our use of cookies as described in our Privacy Policy. You can manage your preferences or reject non-essential cookies anytime.