Get to know more about the project below
It was under construction, a hotel & residential building located in Dublin, Ireland, expected to complete by 2021. The Development of a 140- bedroom hotel and residential with Basement plus 2 towers of 5 upper floor & 8 upper floors, respectively
Preparation of RC Shop drawings & BBS for:
- Foundations
- Basement to Upper floor slab
- Transfer Beams
- Columns
- Core Walls
- Staircase
- Retaining walls
- UG water Tank
- Pipe Trenches
- Manholes & Ramp Slab
- Ramp Walls & Electric Substation
- AutoCAD with CADS-RC