Get to know more about the project below
Model Creation in SDS/2, Structural Steel detailing for Main & Misc. Steel
SDS/2
727 Tons
3D Model in SDS/2 , Erection, Shop Drawings & Gather drawings. , DXF Plates, KISS / NC Files
This Project is mainly a renovation of an Elementary school located in USA. PGT awarded majority of main steel scope & some part of Miscellaneous framing. PGT actively participated in Coordination with other trades for timely delivery and completed project on schedule.
Since this project is the demolition and renovation of existing Building so there was lots of co-ordination between PGT &
otherTrades. Also, Engineering connections are problematic due to heavy loads given by SEOR. PGT actively communicated in all coordination, raised all discrepancies in RFI format & submitted this project on time.