Structural Steel Case Study – Warehouse Building, Australia

Get to know more about the project below

PGT SCOPE:

Structural Steel detailingfor Main & Misc. Steel

SOFTWARE USE:

Tekla

TONNAGE:

Around 500 MT.

PROJECT DELIVERABLES:

3D Model in Tekla, Erection and Shop Drawings, Gathered Drawings, BOM, KISS/NC Files.

CHALLENGES:

The challenge was to complete the job within the timeframe, despite missing information and the need for RFIs.