PGT SCOPE:

Structural Steel detailingfor Main & Misc. Steel

SOFTWARE USE:

Tekla

TONNAGE:

Around 500 MT.

PROJECT DELIVERABLES:

3D Model in Tekla, Erection, Shop Drawings & Gather drawings BOM, KISS / NC Files

CHALLENGES:

Challenge was to complete the Job within time frame with a lot of missing information & need for RFI's.