#StructuralSteel
This is 5-ton staircase requiring 150 manhours.
We modelled & detailed the curve stairs at the lobby in the Moye White project in SDS/2 Department.
Model Creation in SDS/2, Structural Steel detailing
for Main & Misc. Steel
Structural Steel detailing for Main & Misc. Steel
The Baker’s Place project in USA, Wisconsin is a new 14-story mass timber mixed-use development that will create 206 homes and preserve the oldest historic piece of the original Gardner Baking Co. Building. Our expertise and mixed blend of high-end automation tools helped us pass through easily.
Structural Steel detailingfor Main & Misc. Steel
Structural Steel detailingfor Main & Misc. Steel
Model Creation in SDS/2, Structural Steel detailing for Main & Misc. Steel
Model Creation in SDS/2, Structural Steel detailing for Main & Misc. Steel
Model Creation in SDS/2, Structural
Steel detailing for Main & Misc. Steel
Model Creation in SDS/2, Structural Steel detailing for Main & Misc. Steel
Model Creation in SDS/2, Structural Steel detailing for Main & Misc. Steel
A five-story industrial building in New York City, USA. A 166-foot-tall structure will span 840,000 square feet and house logistics and warehouse space featuring truck courts, a distribution center, two stories of film and television studios, office space, and on-site vertical parking.
The main stadium is a state-of-the-art structure which is a multilevel structure with 65,000 capacity, 20 suites, and 230 VIP seats
The project was also published in the "Modern Steel Construction Magazine in May 2022" under the title “STRUCTURALLY SOUND”, a remarkable achievement.
The bridge is 130 meters pedestrian bridge spanning across the river. Constructed for people to walk, scoot or cycle using the bridge to commute easily towards another side.
A "Fulfilment Centre Warehouse” project based in OH, USA. A very timebound and challenging project, yet PGT was successful in progressing at a rapid pace of 1,350 tons of steel detailed per week. Our expertise and mix blend of high end automation tools helped us pass through easily.
The project was expected to show many changes post-award and it was lacking in key dimensional information at the start of the project
The project was for a new hospital complex based in Minot, North Dakota. A non-profit organization with more than 150 physicians and is the largest employer in Minot