Pan Gulf Technologies Engineering Services
Get to know more about the project below
The bridge is a 130-meter pedestrian bridge spanning across the river. It was constructed for people to walk, scoot, or cycle, making it easier to commute to the other side. This bridge helps connect locals from the city to the small town, where they can shop, enjoy cafes, and visit restaurants.
01. 3D Model in Tekla Software
02. Erection & Shop Drawings
03. BOM
04. KISS/NC Files
- Around 200 MT
- TEKLA
Challenges:
The model detailing work was completed, but later, the client requested pre-cambering work. This would have led to a delay in the project’s delivery schedule.
Detailing had to be done in sections, and some structural information was missing, making it difficult to establish proper connections.
Solutions:
After understanding the ad-hoc scope of work from the client, we decided to increase our team strength to complete the pre-cambering work. This allowed us to meet the turnaround time given by the client and avoid project delays.
Our experience and expertise in this situation made it easier for us to suggest proper connections for all the missing structural information. This helped expedite the project and ensure timely delivery.
Get in touch with our
Expert’s Today!