Case Study
Precast Outfall Structures
A Precast Project located in the UK with a scope of Structural Design, 3d concrete modelling and 3D reinforcement detailing, Unit drawing and shop drawing.

Case Study
Precast Wingwalls
Our scope involved designing Precast Wingwalls, which were checked for sliding, overturning, and bearing capacity.

Case Study
Precast Tank
Our scope involved designing Precast Tanks, including the Activated Sludge Basin Tank and Flash Aeration Tank, which were designed as propped cantilevers using STAAD Connect Software.

Case Study
Precast Chambers
Our scope involved designing Precast chambers and cover slabs. The chamber walls, which have a large opening, were analyzed using STAAD software.

Case Study
Precast Culverts
Our scope involved designing Precast Culverts for Highway loading LM1, LM2, and LM3, in accordance with PD6694 and Eurocodes for Bridges.

Case Study
Bridge Wall
We were appointed as DEC to provide Engineering services for Air Separation Unit (ASU) up to 1250 TPD.

Case Study
Prison project
We were appointed as DEC to provide Engineering services for Air Separation Unit (ASU) up to 1250 TPD.

Case Study
Houses Residential Project
We were appointed as DEC to provide Engineering services for Air Separation Unit (ASU) up to 1250 TPD.

Case Study
Precast Residential Project
We were appointed as DEC to provide Engineering services for Air Separation Unit (ASU) up to 1250 TPD.

Case Study
Residential Building Project
Precast Detailing and Modelling for Sandwich Panels

Case Study
Residential Project
It was a cluster of 3 buildings we prepared a detailed engineering package.

Case Study
Staircase Residential Project
3D Models of various Precast elements – Staircase, Balconies, Landings & Hollowcore slabs

Case Study
Underground Motorway Project
Precast Detailing in 3D(TEKLA) for Exhaust & Supply Ventilation Building

Case Study
IFLY Projects
Preparation of 3D Model in TEKLA & Shop drawings for more than 36 units

Case Study
Commercial Building Project
Erection & Shop drawings, Shared model, 3D reinforcement model

Case Study
Commercial Centre Project
Redevelopment of an old commercial centre site to create a Company Headquarter Campus. The development included demolition of office blocks and the development of 6 storey office buildings over three levels of basement.

Case Study
Shopping Centre Project
The Project is a shopping centre, which has franchise across Australia. The project was about refurbishment to existing shopping centre.

Case Study
Commercial Bank Project
Provided 3D Modelling & Generation of Shop drawing and BBS from the Model